Mile Mark: 31.30
Elevation: 1850'
Date Built: 1891
This mine was the only exclusively shaft mine operated by RI&C, and so was known as "The Shaft". It serviced the upper Barnett seam 1891-1925 and 1941 and was extended to the lower Fulton seam for operations 1899-1925 and 1941. It is likely, though, that the shaft entrance was not used in 1941. The mine's production exceeded 3,194,573 tons.
Back to Woodvale Storage Building |
Click on an image to see larger version | Forward to No. 6 Boiler House |
||
---|---|---|---|---|
Up to Woodvale | ||||
Up to EBT: Cooks to Alvan | ||||
Tour Entry | Tour Index | Tour Info |