Mile Mark: 25.55
Elevation: 1455'
Date: unknown
The south actuator pole for Wrays Hill Tunnel still stands inside the sidings north switch. A long stockpile of ties ready for installation in 1956 still stands by the siding.
Back to Rocky Ridge Bridge |
Click on an image to see larger version | Forward to Wrays Hill Siding |
||
---|---|---|---|---|
Up to Rocky Ridge | ||||
Up to EBT: Saltillo to Cooks | ||||
Tour Entry | Tour Index | Tour Info |